Mining range · Haul roads

DustBinder haul road maintenance methodology

Igugu Industries’ DustBinder haul road maintenance methodology puts the routine for a DustBinder road on one A4 page: six steps from inspecting the road to monitoring it, the equipment they need and what is recorded.

Published · One A4 page

The document

Dust mitigation and ongoing haul-road maintenance.

A routine of inspection, sweeping, targeted repair and calibrated application, with results recorded against the baseline and reported monthly.

Each of the six steps comes with a drawing, and the page ends with the equipment the steps need and what is recorded. Every step is written out below as well, word for word, so it reads on a phone.

Published by Igugu Industries (Pty) Ltd t/a 88Chemco.

The DustBinder haul road maintenance methodology as one A4 page: six numbered steps with pencil drawings (inspect, sweep, repair, compact, apply DustBinder from a water truck, monitor), then the equipment and what is recorded. Open the full-size image (PNG, 4.4 MB)
The DustBinder haul road maintenance methodology on one A4 page: the six steps, the equipment they need and what is recorded.

The method

Six steps, from inspection to monitoring.

  1. Inspect the road and identify priority maintenance sections.

    Routine: Assess road condition, identify dusty, rutting or corrugated sections, and determine maintenance priorities.

  2. Mechanically sweep the surface using a tractor-towed sweeper.

    Routine: Remove loose material, excess aggregate and debris to improve surface consistency and product effectiveness.

  3. Repair damaged spots only, with quarry material.

    If necessary: Cut out the damaged area and fill it with quarry material. No blading of the treated surface.

  4. Compact repaired areas before spraying.

    If necessary: Use a smooth drum roller on the repaired areas only, so the fill binds into the running surface.

  5. Apply calibrated, diluted DustBinder using existing water/spray trucks.

    Routine: Apply DustBinder at the recommended dilution rate using existing water trucks with spray bars for even coverage.

  6. Monitor dust, traffic wear, water usage, and road condition.

    Routine: Conduct regular inspections and repeat targeted maintenance as needed. Results are recorded against the baseline and reported monthly.

Required maintenance equipment

  • Tractor-towed sweeper
  • Existing grader (spot repairs only)
  • Existing water/spray trucks
  • Roller (only if required)

What is recorded

  • Dust levels: measured against the baseline.
  • Traffic wear: surface condition under haulage.
  • Water usage: water used on the routes.
  • Road condition: inspected on every route.

DustBinder for your roads

Which DustBinder, and at what dosage?

DustBinder Lignin and DustBinder Bitumen both go into the water cart at 50–1,000 L per 10,000 L of water, depending on road and site conditions. Tell us the road, its traffic and how you water it now, and we advise which one suits each road and the dosage.

Technical support

Technical support comes with the supply: product selection, dosage and application guidance for your site. Tell us the job, the material and the specification, and we recommend what to use and how to apply it.

Contact

Request a quote.

Send the product, the quantity, the delivery site and the date you need it. Holding an RFQ, tender or BOQ? Send it whole: we price every line we supply and tell you which lines we do not.

Talk to us directly

WhatsApp 084 556 8888
Head office
1225 Keyser Avenue, Queenswood
Pretoria, Gauteng, 0186
WhatsApp